When it comes to installing and commissioning a multi - functional screw oil press, many customers encounter various problems. This guide is designed to walk you through the entire process from installation to production, focusing on avoiding common mistakes in civil engineering foundation construction and electrical wiring.
You may often face issues such as non - compliant civil engineering dimensions, chaotic wiring, and failed commissioning tests. These problems can lead to delays in commissioning and unstable production capacity. For example, if the civil engineering size does not match the requirements of the oil press, it may cause the equipment to be unstable during operation.
The installation process can be divided into several stages: civil engineering preparation, electrical connection, equipment positioning, trial operation, and formal production. Let's break them down one by one.
You need to ensure that the ground meets the load - bearing standards. The ground should be flat and have sufficient strength to support the weight of the oil press. Usually, the ground bearing capacity should be at least [X] kg per square meter. Also, pay attention to the space requirements for the equipment to ensure smooth operation and maintenance.
Proper power configuration is crucial. You should follow the electrical wiring specifications. The power supply voltage should match the requirements of the oil press, and grounding protection measures must be in place. For example, use a three - phase power supply with a rated voltage of [X] volts, and ensure that the grounding resistance is less than [X] ohms.
Place the oil press in the designated position accurately. Check the alignment and levelness of the equipment to ensure its normal operation. You can use a level gauge to measure and adjust the equipment.
Before the formal production, conduct a trial operation. Check the lubrication points, belts, and other components. Make sure that all parts are working properly. During the trial operation, pay attention to any abnormal noises or vibrations.
After a successful trial operation, you can start the formal production. Continuously monitor the operation of the equipment and make timely adjustments if necessary.
Let's take a closer look at some key technical points. For the ground, as mentioned above, the load - bearing capacity is very important. In terms of power supply, in addition to the voltage and grounding, you also need to ensure that the power cable has sufficient cross - sectional area to prevent overheating. For the grounding protection, it can effectively prevent electric shock accidents. And don't forget to check the lubrication points regularly to ensure the smooth operation of the equipment.
There are many real - life cases of common mistakes. For example, if the motor is connected reversely, it may cause the oil press to work in the wrong direction, resulting in poor oil extraction efficiency. Another case is the blockage of the oil circuit, which can lead to a decrease in oil output. By learning from these cases, you can avoid similar problems in your installation and commissioning process.
We provide a professional team that offers both remote guidance and on - site support. Our remote guidance can help you solve some simple problems quickly, while our on - site support can handle more complex issues. With our 7×24 - hour technical support, you can be confident in the installation and commissioning process. We also offer customized installation solutions to meet your specific needs.
Q: What should I do if the civil engineering size does not match?
A: You can contact our professional team. We will provide you with solutions based on the actual situation, such as adjusting the equipment or modifying the civil engineering.
Q: How can I ensure the correct electrical wiring?
A: Follow the electrical wiring diagram provided by us. If you have any questions, you can consult our technical support team at any time.
If you want to ensure a smooth installation and commissioning process of your oil press, click here to learn more about our customized installation solutions and 7×24 - hour technical support.